Thursday, October 8, 2015

Bike Park Time!!!!!

Sedona City Engineering has approved the recently finished 100% planning documents from IMBA Trail Solutions and Stantec Engineering. The city has now opened a request for Statement Of Qualifications (SOQ) on their website for a BSP contractor. If you or anyone you know is interested in applying for the contract follow the bellow link. Huge thanks to all who participated in the BSP task force at the city and especially to Doug Copp the City Bike Cordinator/VVCC board member for keeping the ball rolling on this amazing project. 

Get STOKED!!!!! 

http://sedonaaz.gov/Sedonacms/index.aspx?recordid=205&page=663







Wednesday, October 7, 2015

Fall Trail Work Schedule

YOU ARE INVITED TO JOIN THE FALL 2015 REDROCK VOLUNTEER TRAIL WORK DAYS

 

October 24

November 7 & 21

December 5 & 19

 

All trail work days will start out by meeting at the Old Post Trailhead at 8:30 am. This trailhead is located at the south end of the Old Post Trail, at the Kiosk located by the paved Chavez Ranch Road. The trail work will consist of new trail construction and general maintenance in the Carrol Canyon/Scheurman Mountain area.

 

Directions: From Sedona  head west on 89A (towards Cottonwood), turn left on Upper Red Rock Loop Road. Continue on Upper Red Rock Loop Road for 1.8 miles and take a left onto Chavez Ranch Road. The Old Post Trailhead will be on the left.

 

All trail work sessions start at 8:30 am and conclude at 1:00 pm unless otherwise noted.

What you need to bring: Sturdy closed-toe shoes, long pants, sunscreen, water, snacks, and head protection are required. If you have a bike helmet or hard hat, you can bring that. Hardhats and gloves will be provided for those who do not have them. Trail tools and trail work instructions will be provided. Children under 18 must be accompanied by a parent/guardian. Please put these dates in your calendar and bring your friends and family!There is lots to do, of varying degrees of skill and effort.

For more information please give a call to or email Forrest Saville, Red Rock Ranger District Trail Coordinator.


Forrest Saville


p: 928-203-7509 
c: 928-606-1748 
f: 928-203-7539 
sfsaville@fs.fed.us