Thursday, December 22, 2016

Updated Trail Volunteer Day schedule for January February

The January and February Trail Volunteer schedule has been changed to alternate between Saturdays and Thursdays. The new schedule is

  • Saturday January 7
  • Thursday January 19
  • Saturday February 4
  • Thursday February 16
  • Saturday February 25
  • Thursday March 2


The work days will go from 9am to 12:30pm. The meeting locations for those work days will be posted here beforehand

Wednesday, December 7, 2016

Red Rock Trail Fund

Do you love Sedona's trails? Donating to the Red Rock Trail Fund will go directly to protect and improve them. Donate here


Saturday, December 3, 2016

Trail Volunteer Day schedule for January February

The January and February Trail Volunteer dates will be

  • Saturday, December 17th
  • Saturday, January 7th
  • Thursday, January 19th
  • Saturday, February 4th
  • Thursday, February 16th
  • Saturday, February 25th
The work days will go from 9am to 12:30pm. The meeting locations for those work days will be posted here beforehand

Volunteer trail work day Oak trail in Dry Creek area December 17th

Volunteer Trail day with Forest Service
Saturday, December 17th
9:00am - 12:30pm
Help get Oak Trail on the right-single track!

What to bring:
  • Sturdy closed-toe shoes.
  • Long pants and work gloves
  • Sunscreen, water, and snacks .
  • Bike helmet or hard hats (provided)


Where:  Long Canyon Road  
Mescal Trail crossing.  From Sedona take Dry Creek Road to Long Canyon Road turn right and continue approximately 0.5 miles. Look for sign. Limited parking along side road. Please carpool.

Questions? Contact
Bret Edstrom
928-203-7509

bretaedstrom@fs.fed.us

Wednesday, November 30, 2016

With Amazon Smile your Amazon purchases donate to VVCC

If you are using Amazon for much of your online shopping, help Support the Verde Valley Cyclists by using Amazon Smile. This is a program where Amazon donates 0.5% of your purchases to the charity of your choice, at no cost to you.


  1. Simply go to http://smile.amazon.com and select “Verde Valley Cyclists Coalition” as your designated charity
  2. Then start using the http://smile.amazon.com for your amazon shopping. It is the same site as amazon and uses your existing amazon account, but 0.5% of your purchases are donated to the Verde Valley Cyclists Coalition
  3. The Valley Cyclists Coalition uses the donations to improve the cycling environment in the Verde Valley Area. This includes working with the forest service regarding trail development and bike access, providing signage for trails, working with the city to provide bike lanes, road cleaning to make bike lanes safer and other cycling related advocacy in the Verde Valley Area.
Thank you for supporting cycling in the Verde Valley!

Saturday, November 5, 2016

Volunteer trail work day Crusty Trail November 19th

Volunteer Trail day with Forest Service
Saturday, November 19th
9:00am - 12:00pm
Help get Crusty Trail on the right-single track!

What to bring:
  • Sturdy closed-toe shoes.
  • Long pants and work gloves
  • Sunscreen, water, and snacks . 
  • Bike helmet or hard hats (provided)

Where: Lower "Tunnel" Parking Lot
From 89A in Uptown Sedona take Brewer Road from round-a-bout and take immediate
right at real estate agency. Look for sign.

Questions? Contact
Bret Edstrom
928-203-7509
bretaedstrom@fs.fed.us


Friday, November 4, 2016

Greater Grand Canyon Heritage National Monument Proposal


Read about the Greater Grand Canyon Heritage National Monument Proposal and mountain biking here

Wednesday, October 26, 2016

Sedona seeking residents input for Transportation Master Plan for the City

Sedona has hired a consultant to create a Transportation Master Plan for the City. Initially the consultant wants to hear from residents. You can provide your inputs here:
This online survey takes about 5-10 minutes to complete and will be live for about 3 weeks

Thursday, October 20, 2016

2016 USFS Fall/Winter volunteer trail work to begin in November

We will post the Fall/Winter trail work schedule here as soon as it becomes available. Stay tunned

Tuesday, January 26, 2016

More New Trails - Your Input Needed!!!!!!






In 2015 the Verde Valley Cyclists Coalition Partnered with the City of Sedona to further plan new construction and adoption of nearly 25 miles of single track in the Dry Creek Area also known as the Western Gateway. Many of you are likely familiar with Last Frontier or Western Civilization trails. We hired Tyson Swasey to design and plan the trail system. Tyson is well known for his work in Moab on Captain Ahab Trail and working with Trail Mix. Tyson now works with IMBA Trail Solutions. The plan created by Tyson has now made its way into a proposal by the FS which also includes a few other projects within the Coconino NF. We need you to give your opinion on the request for comments to the FS. If all goes well we will be hopefully putting much of these propesed trail projects on the ground in the coming work cycles.


We ask that you read through Tysons proposal as there are a number of trails not included into the FS document. We feel strongly that the "Down and Out" trail should be included in the FS planning. The Down and Out Trail adds the full spectrum of skill range to the area.


TYSONS PROPOSAL: https://drive.google.com/file/d/0BztdIccNzQxFS1U1RFo0UGJOYUU/view?usp=sharing

VVCC DRAFT COMMENTS: https://drive.google.com/file/d/0BztdIccNzQxFdHo3aThzNFNGQjg/view?usp=sharing

FS DOCUMENTS HERE: http://www.fs.usda.gov/Internet/FSE_DOCUMENTS/fseprd489167.pdf

MAPS: http://www.fs.usda.gov/Internet/FSE_DOCUMENTS/fseprd489165.pdf


Questions: board@vvcc.us